Location:Home > detail
Phase I Project of Chongqing Rail Transit Line 5
Source:CRECDate:2018年11月28日

The total length of the line is 39. 75 kilometers, of which the underground line is about 31 国产精品国产三级国产普通话. 18-kilometer-long, the elevated line is about 8. 12-kilometer-long, the ground line and the open section are about 450-meter-long. It set 25 stations and the total investment of the project is about 20 billion yuan.

Phase I Project of Chongqing Metro Line 5

 

Print Close